Qinghai Jinhe Cement Co., Ltd.
Qinghai Gonghe Jinhe Cement Co., Ltd. has a daily output of 2500 tons of clinker. The new dry-process decomposition cement production line outside the cellar has a supporting installed capacity of 4.5MW pure low-temperature waste heat power generation. The total investment of the project is 0.28 billion yuan. Construction started in September 2009. Up to now, 0.25 billion yuan has been invested, including 75 million yuan for civil engineering, 0.16 billion yuan for production equipment and 15 million yuan for installation projects. After the project is fully put into operation, the annual output value will be 0.3 billion yuan and the annual tax creation will be 0.1 billion yuan.
Qinghai Gonghe Jinhe Cement Co., Ltd. has a daily output of 2500 tons of clinker. The new dry-process decomposition cement production line outside the cellar has a supporting installed capacity of 4.5MW pure low-temperature waste heat power generation. The total investment of the project is 0.28 billion yuan. Construction started in September 2009. Up to now, 0.25 billion yuan has been invested, including 75 million yuan for civil engineering, 0.16 billion yuan for production equipment and 15 million yuan for installation projects. After the project is fully put into operation, the annual output value will be 0.3 billion yuan and the annual tax creation will be 0.1 billion yuan.
The circulating water system, turbine lubricating oil system and boiler feed water system of 2500t/d dry process cement kiln low temperature waste heat power station are all equipped with Changsha Foss brand water pump.
Key words:
Changsha Fusi Water Pump Industry Co., Ltd.
Address: No.9, Yuhua Road, Yuhua District, Changsha City
Mailbox:cssbgs@163.com
Telephone:0731-85555304/85350061
Focus on us
mobile website
Copyright©2022 Changsha Fusi Water Pump Industry Co., Ltd. | Business License | Urban Substation